As part of the ten-year tests, installation of instrumentation for the tests and
Measurements of reactor building leakage rates:
• installation of portable telemetry (installation of the mobile auscultation device: sensors, wiring
temporary; installation of the mobile leakage rate measuring device),
— carrying out work to repair the auscultation devices in place,
• installation of new sensors for enclosure testing (non-equipped areas which can be used as a means of testing the enclosure).
becoming): equipment of hardware access buffer, Z-sensor installation, facing sensor installation.
As part of the ten-year tests, installation of instrumentation for the tests and
Measurements of reactor building leakage rates:
• installation of portable telemetry (installation of the mobile auscultation device: sensors, wiring
temporary; installation of the mobile leakage rate measuring device),
— carrying out work to repair the auscultation devices in place,
• installation of new sensors for enclosure testing (non-equipped areas which can be used as a means of testing the enclosure).
becoming): equipment of hardware access buffer, Z-sensor installation, facing sensor installation.