Awarding of construction work locksmith:
15lm grate covers, 400m railings. 16m fence system H=2,5m with 2 pcs doors 2-wing, 2pcs. letterbox systems approx. 860x1900mm
150m TH railing closed sheet steel, 340lfm handrails round tube, 2pcs staircase partitions as picket fence with door, roof crossing
The district office Rems-Murr-Kreis is planning the construction of a new office and administration building at Alten Postplatz 10 in Waiblingen. For this purpose, the existing parking garage was dismantled in order to erect a new building at this point, which fits into the surrounding area as an urban accent self-sufficiently to the existing buildings. In order to implement the construction project, the district office pursues the goal of constructing a sustainable building with a high level of user comfort. Special emphasis is therefore placed on the aspects of energy efficiency, energy supply, modern office concepts and mobility. The building consists of 4 upper floors (including office / meeting rooms, consulting areas), the ground floor (including entrance / consulting area), as well as 3 basements (underground car park / technology).
The total gross floor area is 17,019 m2.
A valid development plan is available for the planning area.
The project planning is carried out by Ackermann + Raff GmbH & Co. KG and the project management by THOST Projektmanagement GmbH. The BIM method (Building Information Modeling) is used for the implementation and management of the new administration building.
The new three-storey underground car park is planned as a reinforced concrete construction. The ceiling between the underground car park
and the upper floors is designed as an 80c m thick interception ceiling, under the change of the
different load-bearing systems. For the massive core zone on the upper floors, a reinforced concrete version is planned to stiffen the building. The areas around the core zone are planned as a timber hybrid construction. A board stacking ceiling including acoustic milling with concrete and wooden supports along the façade is planned to transfer the loads. Non-load-bearing walls are bricked in the basement
Upper floors are designed as drywall walls and system partitions.
The project NAP 10 Landratsamt Waiblingen is carried out according to the requirements of the German
Sustainable Building Council ( D GNB) n ach the usage profile of new office and administration building
Version 2 018 certified. Quality level 4 of criterion ENV1 .2 applies.