the contract concerns the interconnection and drinking water supply works - OP9: La Riffaudière - Sonville. It is composed of 2 lots: Lot 1: Networks and Lot 2: Equipment
NetworksThe objective of the OP9 work is to ensure the supply of drinking water to the Sonville reservoir located in Dangeau from the water resources of the SMO (Syndicat Mixte de l'Ozanne). Firm section: connection of the OP9 works to the SMO network at La Riffaudière sur Yèvres. Optional Tranche 1: Replacement of the existing 1957 Dn100 distribution line on which our connection is planned
equipmentsLot 2 includes the rehabilitation of the Sonville reservoir in Dangeau, the abandonment of the existing borehole, and the supply and installation of all the equipment including a flow meter in the metering chamber, including the autonomous data logger for the transmission of data via the Modbus system to remote management.