Pipeline contract for a new building on the Toivonkatu campus in Luxembourg.
New building approx. 8,000 brm
The building is a 1 to 3-storey building with a prefabricated concrete structure, the facades of which are mainly concrete sandwich panels and glass. The water ceiling is a wood-ceilinged roof.
The project is implemented through a split contract. Separate construction (= main), pipe, ventilation, and electrical works are carried out on the site.