The object of the order is the Modernization of the currently used software with the expansion of the hardware infrastructure and the launch of e-services for Prof. Antoni Kępiński's Specialist Psychiatric Health Care Team in Jarosław, which is implemented as part of the project “E- services at Prof. Antoni Kępiński's Specialist Psychiatric Health Care Team in Jarosław”.
4.1. The object of the order is the Modernization of the currently used software with the expansion of the hardware infrastructure and the launch of e-services for Prof. Antoni Kępiński's Specialist Psychiatric Health Care Team in Jarosław, which is implemented as part of the project “E- services at Prof. Antoni Kępiński's Specialist Psychiatric Health Care Team in Jarosław”.
4.2. The subject of the contract referred to in point 4.1 shall, in particular, include:
1) upgrading hardware resources, purchasing computer hardware and software, including:
— modernization of the LAN (37 computer points),
— upgrading the power supply
— aggregate switching automation — 1 pcs. ,
- Preparation of the supply track under UPS - 1 pc ,
- UPS emergency power supply - 1 pcs ,
— fire extinguishing system — 1 pcs. ,
- extinguishing control panel with wiring - 1 pc ,
— detector — 2 pcs. ,
- gas cylinder - 1 pc ,
— rooting with nozzles — 1 kpl.
— relieving flap — 1 pc ,
— air conditioner — 2 pcs ,
— LAN - Core network switch — 2 pcs ,
— LAN network switch — idf — 19 pcs ,
— firewall — 1 pcs ,
—... the central logs system — 1 pcs. ,
— FC switch — 2 pcs ,
— PCs with software — 113 pcs ,
— modernization of computers — 34 pcs. ,
- 256 GB SSD - 34 pcs ,
- 8GB RAM - 34 pcs ,
— Virtualization server — 2 pcs. ,
— database server — 2 pcs ,
- backup server - 1 pc ,
— Disk array — 2 pcs. ,
— housing 24 slots — 2 pcs ,
- SAN controller - 4 pcs ,
- SSD with a capacity of at least 3.8 TB - 48 pcs ,
- Medical Image Distribution Server - 1 pc ,
— laptop — 2 pcs. ,
— tape library — 1 pcs. ,
— scanner — 5 pcs ,
- Medical device: X-ray digitation - 1 pc ,
— station assist (hardware part) — 40 hours,
— installation and configuration (hardware part) — 500 hours;
2) purchase or execution, installation and implementation of software, including:
field software — expansion/upgrade (modules)
— Application Server (License Number of Application Servers) — 3 pcs ,
— eResults module — 1 face open,
— eArchive module — 1 face open,
— eSkan module — 1 face open,
— Rehabilitation module — 1 face open,
— Medical Documentation Management module — 1 face open,
— image documentation sharing module — 1 face open,
— database — 8 pl.
— Pre-term analysis — 400 h,
— implementation — 400 hours,
— data migration — 200 hours,
— post assists — 250 hours,
- integration with RCIM - 1 pc ,
— data rail — 1 lic.,
— broker — 1 lic.,
— authentication module — 1 lic.
— Communication module — 1 pcs/pcs. ,
— Web portal — 1 lic.
— operating system — 2 pcs. ,
— backup and data archiving software — 1 pcs/pcs ,
— Virtualization software — 1 pcs/pcs.
4.3. Detailed scope of the order, includes annex 1 (Detailed description of the item of the order) and 1a to SWZ (Detailed description of the item of the order).
4.4. warranty
The Contractor is obliged to grant the Contracting Authority a quality guarantee for a minimum period on the terms detailed in Annex No 1, in accordance with the following table:
— modernization of the LAN — 25 years,
— power upgrading — 60 mies. ,
— UPS emergency power supply — 36 mies. ,
— fire extinguishing system — 36 mies. ,
— air conditioner — 36 mies. ,
— LAN switch — CORE (assessment criterion item) — min. 36 manufacturer warranty
— LAN switch — IDF (assessment criterion item) — min. 36 manufacturer warranty
— firewall (item covered by the evaluation criterion) — min. 36 manufacturer warranty,
— the central logs system (item covered by the evaluation criterion) — min. 36 manufacturer guarantee,
— FC switch (assessment criterion item) — min. 36 manufacturer warranty,
— PCs with software (item covered by the evaluation criterion) — min. 36 manufacturer warranty,
— upgrading of computers (item covered by the evaluation criterion) — min. 36 manufacturer warranty,
— Virtualization server (evaluation criterion item) — min. 36 manufacturer warranty,
— database server (evaluation criterion item) — min. 36 manufacturer warranty,
— backup server (evaluation criterion item) — min. 36 manufacturer warranty.