Construction work for school buildings | Tenderlake

Construction work for school buildings

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 August 2021
Closing Date:
08 September 2021
Location(s):
DED2C Bautzen (DE Germany/DEUTSCHLAND)
Description:
extension new building + 2.BA Gymnasium Kamenz, Henselstr. 14, 01917 Kamenz, lot 17 flooring works - old building

It is intended to realign the Kamenz school location (grammar school / high schools). For this purpose, the historic building at Henselstrasse 14 is to be activated again as a grammar school and expanded. The existing building of the former Lessing School, with its history going back more than 100 years, is of great importance for urban planning as a single monument. It is to be integrated and upgraded in the overall concept. In addition to the necessary structural measures for the resumption of school use (2012 construction-related closure of the external location of the Kamenz grammar school), the associated energy optimization is also planned. In the course of the renovation, the complex will also be accessible and the outdoor facilities will be extensively redesigned. After an already implemented 1st building phase, construction measures in connection with the construction of the intermediate building and extension building to create the final state (2nd building phase) are carried out on the old building Henselstrasse: sealing of the external walls in contact with the ground, renewal of the auditorium / restoration as a meeting room, installation of suspended ceilings, Interior insulation window reveals, ceiling insulation 2nd floor to attic, renewal of windows / window sills, reconditioning of historical interior and exterior doors, equipment with sun protection / darkening systems, facade painting, painting u. Floor laying work. For the development of the school location Henselstraße as the central grammar school of the city of Kamenz, not only the listed building ensemble of the Lessing school has to be restored, but the necessary space for the modern operation of a three-class grammar school has to be created in a new extension to be built. Structurally, parallel to the listed ensemble of the old Lessing School, east of this, the extension is arranged as a linear four-storey building block. Together with the historic old building, this forms a protected three-sided inner courtyard. The distinctive head building of the extension building corresponds in terms of urban planning along Oststraße with the listed sports hall of the old building. The new entrance building with a central staircase and elevator is located as a link in the focal point of the complex on the south side and is reached from the extension of Haberkornstrasse. The connecting hall connects and makes all levels of the two buildings accessible to each other.

Remove 165 m² floor coverings (PVC, textile, etc.)

2210 m² surface preparation for flooring

1270 m remove edge strips

39 pcs Concrete Moisture Check, CM Method, Concrete

39 pcs adhesive tensile strength check

275 m closing of cracks

1980 m² cleaning sanding

1980 m² vacuuming screed surfaces

1980 m² premlining

Attach 50 m edge insulation strips

1980 m² balancing of bumps

1980 m² spatulas

1980 m² second filling

1980 m² linoleum flooring

1980 m² grouting linoleum flooring

1270 m edge joint

65 m motion joint profile

85 m installation transition profile (T-profile), linoleum

1445 m skirting board

2211 m² protective cover

1980 m² construction final cleaning of elastic floor coverings, interior

1980 m² linoleum covering, first care

15 m² PVC flooring

215 m² woven carpet

275 m pipe cover strip

Doing 50 door sleepers

Add 10 door sleepers

Download full details as .pdf
The Buyer:
Landratsamt Bautzen, Gebäude- und Liegenschaftsamt, Zentrale Vergabestelle
CPV Code(s):
45214200 - Construction work for school buildings