Extension of the district hospital in Altötting - additional care.
Earthing system for steel construction:
- approx. 3,200 m of V4A stainless steel strip;
- approx. 280 connecting flags;
- approx. 400 disconnect terminals.
Lightning protection system:
- High voltage resistant insulated system;
- approx. 900 m of insulated leads;
- approx. 50 pylon with tripod.