The subject of the contract is the execution of design and construction works of a complete photovoltaic installation with a capacity of 49.7 kWp located at the headquarters of the Skrwilno Forest District
The subject of the contract is the execution of design and construction works of a complete photovoltaic installation with a capacity of 49.7 kWp located at the headquarters of the Skrwilno Forest District, including: a. execution of an electrical design containing diagrams, drawings necessary for the proper execution of the electrical installation and automation system of PV panel installations; b. design of the assembly structure for PV panels; c. construction of a photovoltaic panel system with the supply of instrumentation and cabling; d. connection of the photovoltaic installation to the internal network of buildings in the place upstream of the aggregate and reconstruction of the energy measurement system adapting the system to measure generated energy; e. configuration of the surveillance system application; f. performing appropriate tests and measurements and drawing up protocols