The purpose of this consultation is to award a works contract for the design, construction, supply, delivery, handling, assembly and commissioning assistance of 2 biomass boilers with a useful power of 25MW (from biomass feeding to ash evacuation and the treatment and evacuation of combustion fumes)
Works contract for the design, construction, supply, delivery, handling, assembly and commissioning assistance of 2 biomass boilers with a useful power of 25MW (from the supply of biomass to the evacuation of ashes and the treatment and evacuation of combustion fumes). The contract will be divided into several tranches:- Firm tranche: Studies and design- Optional tranche n°1: Procurement and Manufacturing- Optional tranche n°2: Assembly and industrial commissioning