Structural shell work | Tenderlake

Structural shell work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
30 April 2020
Closing Date:
20 May 2020
Location(s):
DE71A Main-Taunus-Kreis (DE Germany/DEUTSCHLAND)
Description:
GWE Seniorenimmobilie Stadt Eschborn, lot 2 structural work

structural work

Drainage, earthwork, reinforced concrete, masonry work.

The buildings are built in solid construction (reinforced concrete and masonry) with a clinker facade.

The on-site excavation pit will have a size of approximately 90 mx 40 m.

Underground car park:

One-story, complete under both parts of the building (residential building and nursing home) and parts of the outdoor area.

OK original area or planned area.

Underground car park:

Axis AS / 1-20 plus entry and exit. OKFF TG = -3.50 = +127.50 g. NN

Entry and exit on the main street:

This is located between axis 9 and the border to the Christkönigkirche, axis AG.

The level of entry and exit at the border to the main street is

OK = +0.30 = +131.30 a. NN

Exit on the street "Hinter der Heck":

This is located between axis 20 and the border to the kindergarten.

The level of the exit at the border to the street "Hinter der Heck" is OK = +1.10 = +132.10 ü. NN

Residential house for seniors:

The residential building has a three-story part (ground floor-2nd floor) with a flat roof and a four-story part

Part (EG-DG) with a gable roof. OK original site or planned site see attached planning.

Saddle roof structure:

Axis AD / 1-9

OKFF EG = + -0.00 = +131.00 over. NN

OK eaves = approx. +10.20 = approx. +141.20 a.s.l.

OK dormer = approx. +12.25 = approx. +132.25 above sea level

OK First = approx. +17.65 = approx. +148.65 above sea level

Flat roof structure:

Axis DH / 5-9

OKFF EG = + -0.00 = +131.00 over. NN

OK parapet, raw = +9.70 = +140.70 a.s.l.

Building for house communities (nursing home):

The house has three floors and a flat roof.

Building (nursing home):

IS / 10-20 axis

OKFF EG = +0.60 = +131.60 ü. NN

OK raw roofing = +9.94 = +140.94 a.s.l.

OK parapet raw = +10.29 = +141.29 a.s.l.

OK parapet elevator = approx. +11.20 = approx. +142.20 a.s.l.

Main masses:

- approx. 90 m ground lines;

- approx. 835 m 3rd Pit filling;

- approx. 540 m 3rd Foundation concrete;

- approx. 2 700 m 2nd Load-bearing reinforced concrete floor slab, WU;

- approx. 415 m 2nd Reinforced concrete ramp access, WU;

- approx. 2 365 m 2nd OS8 coating;

- approx. 2,000 m 2nd Reinforced concrete walls, WU;

- approx. 5 040 m 2nd Reinforced concrete walls;

- approx. 9 100 m 2nd Reinforced concrete ceiling tiles;

- approx. 370 m 3rd Reinforced concrete columns, beams and linings;

- Approx. 4 pieces of precast reinforced concrete systems;

- approx. 53 m 2nd Masonry;

- approx. 2 850 m 2nd Clinker brick facade;

- approx. 85 m reinforcement with insulating body;

- approx. 765 t of structural steel.

Download full details as .pdf
The Buyer:
Gemeinnütziges Wohnungsunternehmen Eschborn GmbH
CPV Code(s):
45112000 - Excavating and earthmoving work
45210000 - Building construction work
45223220 - Structural shell work