Building construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
23 December 2022
Closing Date:
16 January 2023
Location(s):
FRK AUVERGNE-RHÔNE-ALPES (FR FRANCE)
Description:
CONSTRUCTION AND DEVELOPMENT TRAINING CENTER ENEDIS LA PEROLLIERE

EDF buys on behalf of ENEDIS the construction work of three buildings and the exterior fittings of the training center "La Perollière" located in the municipalities of Saint Bel and Saint Pierre la Palud (69).

The buildings are intended for the administrative pole of the site, accommodation and training of trainees.

Outdoor facilities include roads, networks, street furniture, landscaping.

All descriptive elements are available on PHA V1 RFx_118365 - 22 TXA M ENE AMENAGEMENT ECO CAMPUS

GENERAL EARTHWORKS - VRD - LANDSCAPING

The nature of the work concerns:

-The EXE mission of the works is the responsibility of the company responsible for the work

-All the preparatory work to release the current rights-of-way

- Demolition / condemnation / diversion of existing networks

- Demolition of roads and masonry elements (curbs, stairs, ...)

- Identification / marking of existing trees conserved, and to be felled

- Tree felling including removal of stumps and clearing of plants

- Removal of exterior locksmiths (fences, gates, bodyguards, handrails)

-General earthworks

- General earthworks of the support platforms of the building foundations (+/- 9500m3)

- Drainage of platforms including connection

- General earthworks of the external platforms (+/- 12500m3)

- Earthworks in excavated material / backfill, storage and / or disposal

- Realization of layers of support shapes including compaction and control

-Realization of roads, path and parking area (About 2800m² of permeable surface & 9400m² of asphalt)

- Realization of coatings (asphalt, concrete, stabilized, concrete slab joined lawn, wood deck)

- Construction of roads, pathway and parking area

- The implementation of curbs (concrete T2, P1, volige wood, bastaing wood)

- The realization of horizontal and vertical signage

-Realization of masonry, exterior locksmiths and furniture

- Stairs, bleachers

- Fences / gates / handrails

- Bicycle hoops / Baskets / Benches / Potelets

-Realization of wet networks (+/- 1100ml of linear networks)

- Wastewater disposal network including connection to existing networks of the site

o PVC CR8 pipe and / or concrete 135A / Connection box foot façade + inspection manhole DN1000

- Stormwater management network including construction of buffering works, connection to existing networks of the site

o PVC CR8 pipe and / or concrete 135A / Connection box foot façade + inspection manhole DN1000 / Road grid + Gutter grid

- Drinking water supply network including connection to existing network site

o PE pipe + Watering and washing mouth

-Realization of dry networks (+/- 9500ml of ducts)

- Electrical network of the site + educational + electric charging station + outdoor lighting

o Civil engineering (trench, sheaths, drawing chamber, copper...)

o Platform support electrical substation / Massive foundation cabinet & terminal

- External access control network and telecom

o Civil engineering (trench, ducts, drawing chamber)

o Automatic barrier

-Realization of landscaping

- Soil preparation and topsoil implementation (+/- 30,000m²)

- Realization of plantations (trees, hedge, grassing ...) (About 220 trees & cépées, +/- 6500m² of hedge planting, About 6000m² of massive planting, +/-15,000m² of grassing, meadow)

Metallerie

The services of the Metalwork lot for this operation are as follows:

The EXE mission of the works is the responsibility of the company responsible for the works.

- About 50 units of door block with powder coating finish and with thermal and acoustic performance.

- Metal staircase: about 22 flights with grating or wood step.

- Interior or exterior metal railing with bars. Powder coating finish. Approximately 450 ml of guardrails.

- Handrail of stairs and various works.

Technical flooring

The services of the Technical Floor package for this operation are as follows:

The EXE mission of the works is the responsibility of the company responsible for the works.

-For heavy load about 170 m². Tiles of 600x600mm type raised floors type Alucast.

-For thin floors 60x60 about 1500 m² type raised floors. Finish by antistatic coating, laminate, high pressure, thickness 2 mm, linoleum or vinyl tinted at the choice of the Project Manager in the manufacturer's range.

-For raw finish about 1308 m² type raised floors type Dall/RB (recycled materials) or type G. Finishes by PVC floor in slabs or slats at the charge of the lot Flexible floors.

Soft floors

The services of the Flexible Soils package for this operation are as follows:

-All preparatory work including moisture barrier, leveling.

-PVC finish in isophonic strips U4P3 or U3P3 in strips with transparent wear layer type Taralay printing of GERFLOR. About 4100 m².

-PVC floor in slab or LVT blade. About 1400 m².

-PVC floor Anti-slip technique to the right of household premises.

-Rubber floor for heavy loads in slabs of 60x60 cm. About 280 m².

-Woven vinyl tile 39m² for the Zen room tertiary building.

-Other structures such as floor drains, baseboard surveys, bases for pipe passages, thresholds, etc.

tile/earthenware

The services of the Tile Faience lot for this operation are as follows:

-All the work of acoustic underlayment, screed form of slope (520 m²), SEL (620 m²), or SPEC (1440 m²) for the vertical parts.

-The realization of porcelain stoneware floors format 45x90, 30x60, 30x30. About 1400m² including 373m² of collective kitchen with epoxy joint.

-The realization of wall coverings in earthenware or porcelain stoneware. About 5100 m²

-Other works such as tiled pedestals, bases for pipe passages, mirrors, floor drains, gutters, and entrance mats.

Hvac/Plumbing/Sanitary

The services of the HVAC Plumbing lot for this operation are as follows:

The EXE mission of the works is the responsibility of the company responsible for the works.

-Copper distribution network with insulation class of hydraulic networks:

• Class 4 for networks located outside the insulated building envelope

• Class 3 for chilled water systems located inside the insulated building envelope and DHW

• Class 2 for heating networks located inside the insulated building envelope and EF

-Copper plumbing and heating network (except recessed in presheathed PER / distribution by tablecloth in the level or lower level on Formation and Tertiary and by column on Accommodation.

Here are the main descriptions of the services to be performed for the plumbing part:

-A rainwater recovery system for toilets and outdoor watering is planned on tertiary buildings

-Fittings in the building Accommodation: Approximately: 144 pieces of furniture Bathroom; 8 PRM washbasin; 152 WC); 6 showers; 1 drains

-Equipment in the building Training: Approximately: HIMAC resin washbasin tops (4 single, 5 double); 6 showers; 2 drains, 4 washbasins;11WC;9 urinals

-Apparatus in the tertiary building: Approximately: HIMAC resin washbasin tops (2 single, 10 double); 6 showers; 2 drains, 10 washbasins;12WC;8 urinals

-Electrical tracing will be provided in areas with risk of frost (outside, crawl space).

Here are the main descriptions of the services to be performed for the HVAC and DHW part per building:

For the Training building:

-The heat production of the Formation building is ensured by a geothermal energy by probes and a backup-rescue by gas boiler of 350kW.

-Operation on the building Training in thermo-fridgepump (simultaneous hot / cold) and on the tertiary in hot only.

-The transmitters are cassettes in most spaces, air conditioning will also be present in these rooms, radiators are provided in the non-air-conditioned rooms. Approx.: (80 cassettes 4 tubes / 70 radiators)

-The ventilation will be done in hygienic double flow CTA + adiabatic treatment (Approximately: 3 CTA)

-The DHW will be done by cumulus clouds distributed throughout the building. (Approx.: 8 balloons)

For the tertiary building:

-The heat production of the building is done via substation located at the R-1 of the building supplied by building Formation by an underground heating network.

-The transmitters are radiant panels in the restaurant area About: (58m²), heated floor in the hall About: (300m²) and radiators in the rest of the spaces (about 110 units)

-The ventilation will be done in HK double flow Hygienic + adiabatic treatment Approximately: (3CTA)

The DHW of the catering area will be done by an ECS Gas preparer

The ECS will be done by cumulus clouds distributed throughout the building.

For the Accommodation building:

-The production of heating and DHW will be done by about 3 Air-WATER HT heat pumps with a unit power of 50kW + electric boiler in emergency 72kW.) + solar thermal

-The transmitters will be radiators with thermostatic head controllable by WIFI Environ (153 units)

-The ventilation will be done by single flow extractor Hygro B Approximately: (2 boxes)

cfo/cfa electricity

The services of the CFO-CFA Electricity package for this operation are as follows:

The EXE mission of the works is the responsibility of the company responsible for the works.

For the CFO part:

-Routing and distribution of networks via marine slab cable tray

-External lighting of the entire site to be provided (about 105masts high of 8m and 4m)

-Outdoor box for electric vehicle charging stations (10 units) + cable pulling for 30% of the fleet (MOA charging stations)

-For the HTA part: Creation of a new HTA loop on the site. Estimated power of the 4MVA loop (not expanded) with a new substation to be planned as well as 3 other substations: 2 substations of 630kVA (Tertiary and External Station) and 1 of 800kVA (Training), the other substations of the existing buildings being already existing on the site.

-Power supply + installation of boxes used to power electric vehicle charging stations

-A photovoltaic production is to be expected in self-consumption on the site for the following buildings. Hosting: 45kWp / Training: 64.3 kWp / Tertiary: 56.6 kWp

-Addressable security lighting throughout the site. BAES + BAEH on the building Accommodation. (BAES (45lm)=approx190 / BAES (360lm) = 30units / BAES+BAEH=30)

For the CFA part:

-Routing and distribution of networks via marine slab cable tray

-For the ISS, it is planned to set up an Operating Assistance Unit (UAE) in the site's security PC, taking over all the ISS of the buildings on the plot. (SSI type 1 on each building)

-Local core network managing the entire computer and telephone network of the site by star cabling + network looping. 48-strand OS2 type fiber (About 3.5km of cable)

-Access control will be done by the installation is type ANSSI 1er, totally wired and level using technology Mifare DESFIRE EV2 badge technology – 13.56 MHz, 8 KB of memory. Use of the DRIM Nord software server EST installed in ENEDIS DATA CENTER. Mark imposed by access control by ENEDIS (TIL) (total: 380 LB)

-The anti-intrusion will be provided by the installation of an intrusion alarm equipment per bus type building for the surveillance of the building type NFAP2P 3 shields on the entire security chain (from the central to sirens and detectors). All doors to the outside will be equipped with opening contact generating an alarm in case of opening outside the scheduled hours.

-The security of the outdoor spaces will be done via badge readers and videophone on potelet to the right of the gates and access portal of the site.

-A video surveillance system: Total camera: indoor 6, outdoor: 22

A color supervision monitor will be installed in the security PC of the tertiary building. It will allow you to view all the different cameras mentioned above.

-Sound: 12 mini bay; Wifi and DECT in pre-wiring

Elevators

The services of the Lifting Devices package for this operation are as follows:

-Supply and installation of 630kg devices with on-board machinery with walls with brushed stainless steel coatings. Handrail, control panel, stainless steel ceiling with lighting and mirror...

For the tertiary building: 2 U with 4 levels served

For the training building: 1 U with 3 levels served

For the Building accommodations: 1 U with 5 levels served.

COOKING AND CATERING

Kitchen of about 490 m². The equipment will prepare 500 meals / day, 300 at lunch and 200 meals in the evening. The distribution will be carried out in a hot chain via the self line. An export of meals to Villa Mangini is also planned.

Complete kitchen equipment for Reception/Storage premises; Vegetable; Pastry/Cold preparations; Shipments/Returns; Diving battery; Hot preparations; Self; Laundry: Dining room. Some existing equipment is to be recovered.

Refrigeration equipment operating on R449A for the cooling of negative or positive cold rooms and for maintaining the temperature of the rooms below. Independent refrigeration equipment comprising external condensing unit, support evaporator, control box, refrigeration links, electrical equipment, condensate disposal, tests and adjustments

- Positive cold room "Meat": + 2 ° C

- Positive cold room "BOF": + 4 ° C

- Positive cold room "Vegetables": + 6 ° C

- Positive cold room "Finished products": + 3°C

- Waste rooms: + 10°C

Shared refrigeration equipment including external condensing unit, evaporators on support in each room, control box above the door of each room, refrigeration links, electrical equipment, condensate evacuation, tests and adjustments:

- Pastry: + 10 ° C

- Cold preparations: + 10 ° C

Big work

The services of the structural work lot for this operation concern the construction of the Court-Circuit, Training, Tertiary, Accommodation and Hangar buildings:

The EXE mission of the works is the responsibility of the company responsible for the works.

-The rehabilitation work of the Tesla building includes the interior cleaning with complete exposure of the plateau (about 300m²) and underpinning.

-The site installations are the responsibility of the Gros-Œuvre-Fondation.

-Earthworks by excavations in holes and channels in ordinary and rocky ground are to be expected for the realization of the foundations of the works.

-The Formation and Short Circuit buildings are designed on deep foundations by reinforced piles drilled with the continuous auger single rotation or double rotation (pile class 2 – Category 6). Approximately 1270 ml of Ø42 piles and 300 ml of Ø62 piles.

-The other buildings will be on so-called superficial foundations (about 500m3 of concrete)

-The elevations (sails, posts, beams) represent about 1500 m3 of concrete and prewalls are planned for the construction of the tertiary and formation buildings (about 1580 m²).

-Infrastructure slabs (approximately: paving 510 m²; pre-slab floor from 23 to 30cm 1450 m²) and BA floors for about 11,100 m².

- Floor insulation (About 2160 m²); buried insulation (approximately 1085 m²); and thermo-acoustic insulation on wall (Approx. 250 m²)

-Various works such as stairs, screeds, pedestals, ventilation works, ducts, civil engineering of technical equipment are provided in each building.

WOOD FRAME / WOOD FRAME WALL

This lot concerns the following services:

-The EXE mission of the works is the responsibility of the company responsible for the work.

Some building roofs are provided in 2-sided trusses, including volige and edge planks on a surface of approximately 931.89 m².

The Formation and Tertiary buildings are planned in traditional glulam timber frame with all the secondary frames and assemblies for about 100 m3.

Wood-framed walls on the spinning façade with thermal insulation in 160mm thick cellulose wadding, OSB panels, rain screen and vapour barrier are provided for the Training, Tertiary and Accommodation buildings, on the first floor. Surface of the MOB about 2400 m².

Metal frame

The services of the metal frame lot for this operation are as follows:

The EXE mission of the works is the responsibility of the company responsible for the works.

Metal construction of building walkways Training and accommodation with poles, gantries, crossbow, gussets in commercial profiles or PRS and all bolted assembly parts. Together weighing about 54 tons.

The circulation floors of the central walkways will be made of non-slip composite wood slats on approximately 315m². The grated floors to the right of the gables of the Accommodation and Training buildings represent about 200 m².

Metal frame of the advances of the gables of the buildings Training and Accommodation including assemblies and secondary frames for about 35 tons.

The various other structural steel structures represent about 12 tons.

ROOFING / CLADDING / WATERPROOFING

The services of the Cladding and Waterproofing Cover package for this operation are as follows:

The EXE mission of the works is the responsibility of the company responsible for the works.

-Realization of dry tank for about 2000m ²,

-Sealing work on existing buildings,

- Waterproofing work on new buildings

-Self-protected waterproofing on concrete slab with polyurethane insulation of R = 7.25 m²°C/W (about 1876 m²)

-Inaccessible bitumen waterproofing vegetated on concrete slab with polyurethane insulation of R = 7.25 m²°C/W (About 830 m²).

-Sealing bitumen accessible pedestrian with polyurethane insulation of R = 7.25 m² ° C / W and protection by wooden slats on studs (about 84 m²)

-Sealing accessible bitumen Garden with polyurethane insulation of R = 7.25 m²°C/W (garden protection at the expense of the lot Outdoor facilities): about 55 m².

-Multifunction accessible bitumen sealing with polyurethane insulation of R = 7.25 m²°C/W (about 453 m²)

-Installation and supply of skylights for access and smoke extraction, safety works, rainwater treatment, etc.

The cladding work on the new part will be as follows:

-Cladding in fiber-cement panels Surface about 2600 m².

-Over-façade and over-roof with composite wood cladding About 1600 m².

-On facade in panels type Natura about 1000 m².

-Installation and supply of various works such as bank bands, embrasures, brise soleil in shooting blades, etc.

FACADE / EXTERIOR THERMAL INSULATION / COATING

The services of the Facade ITE Coated lot for this operation are as follows:

For the building under rehabilitation Tesla:

-Preparation of existing façade supports of the Tesla building including recovery of cracks as needed.

-Painting on Tesla building: about 630 m²

For the new part:

-Thermal insulation system from the outside with EPS insulation and finishing coating (about 950 m²) implemented on concrete sails.

-Thermal insulation system from the outside with wood fiber insulation and typical plaster (About 240 m² on MOB).

Various services complete the lot:

-Stain on concrete façade. Approx. 2240 m².

-Includes treatment of carpentry boards, various finishing parts, etc.

Exterior wood furnishings

The services of the Exterior Joinery lot for this operation are as follows:

The EXE mission of the works is the responsibility of the company responsible for the works.

-Exterior joinery including openings in French joinery, casement or tilt-and-turn and with hardware and finishing profiles. About 1500 m² of carpentry on the operation.

-Interior glazed sets, about 300 m², including about twenty glass door blocks with hardware and finishing profile.

Other structures such as sun protection are also present:

- Store screen for about 800 m²

- PVC roller shutters for about 850 m²

Interior joinery

The services of the Interior Carpentry lot for this operation are as follows:

The EXE mission of the works is the responsibility of the company responsible for the works.

-Door blocks with wood or metal frames and leaf with solid or glazed core, laminated finish or to be painted with degree fire, acoustics, trim and hardware etc. Approx. 530 units

-Interior glazed frame with frame to paint with acoustic and fire characteristics.

-Parquet boat deck for Formation and Tertiary buildings. About 640m²

-Acoustic cladding wall and ceiling with interior filling in mineral wool panel behind wooden cleats, local species at the choice of the architect. Finishing by varnish. About 950m².

-Facade and technical hatches to paint.

-Other miscellaneous works such as skirting boards, shelves, corner protectors and joint covers.

-Compact laminate partitions in sanitary facilities with accessories

-Several laminate furniture: reception desk, housing office ...

-Realization of the complete signage of the buildings and the organization chart

LININGS / PARTITIONS / CEILINGS / PAINTING

The services of the Ceiling Partition and Painting Doublages lot for this operation are as follows:

The EXE mission of the works is the responsibility of the company responsible for the works.

For the lining and partition part:

-Pregymetal type lining with hemp cotton linen insulation type Biofib trio with R = 4.20 m². K/W. To the right of the concrete walls insulated by the interior of the building Formation about 700 m².

-EI 1/2h doubling of MOBs with Biofib Trio type insulation on about 1800m².

-For interior partitioning: partitions with biofib insulation of dimensions 72/36, 98/62 160, or 180. About 7500 m²

-Partition with limestone Silico facing for kitchen area with about 500 m².

-Sanitary counter-partition and technical sheath with metal frame and single or double cladding: 1040m²

-Other works such as smoke extraction duct, water-repellent type supplement, etc.

-Includes plastering joints.

For the removable and non-removable ceiling part:

-Plaster ceilings with glass wool insulation in plenum: about 2200 m².

-Ceiling in mineral fiber 120x60 and 60x60. About 1800 m²

-Ceiling in mineral fiber hygiene for the collective kitchen. Approx. 331 m²

-Ceiling in stone wool slab. About 1600 m²

-Textile ceilings. About 70 m²

For the painting part:

-GS coatings and preparation of supports (concrete wall)

-Aqueous phase paint finish B or C on sail for about 21500m² on GS plaster, BA sails or plaster partitions.

-Aqueous ceilings finish b or c on plaster or concrete. About 5500 m².

-Painting on metal, wood and floor painting in technical and storage rooms.

Site cleaning of all the buildings of the operation.

Download full details as .pdf
The Buyer:
EDF SA DIRECTION DES ACHATS GROUPE
CPV Code(s):
39220000 - Kitchen equipment, household and domestic items and catering supplies
45112500 - Earthmoving work
45112700 - Landscaping work
45210000 - Building construction work
45260000 - Roof works and other special trade construction works
45261100 - Roof-framing work
45310000 - Electrical installation work
45313100 - Lift installation work
45321000 - Thermal insulation work
45330000 - Plumbing and sanitary works
45421000 - Joinery work
45421131 - Installation of doors
45421141 - Installation of partitioning
45431100 - Floor-tiling work
45432100 - Floor laying and covering work
45432121 - Computer floors
45440000 - Painting and glazing work