The city of Freiberg am Neckar intends to reorganize the city center. In this context, the existing building of the Oscar Paret School (OPS), which is in great need of renovation, is to be replaced by a new building at an adjacent location, with the existing school only being demolished after the replacement building has been completed and making space for further development areas for the city center. The structure of the new OPS is designed as a three-storey urban edge, facing the center, corresponding to the central development.
The Oscar Paret School is a school network in which the secondary school types high school, secondary school, community school (under construction) and technical secondary school (expiring) coexist. The learning workshop, HOPS (OPS homework supervision) and school social work are located in the same building as important partners of the OPS educational Plus +.
Completion for the school year 2022/2023.
Preparatory measures Construction site equipment of the contractor Technical processing, attachment, joint and installation plan, tile and slab work
Tiles:
Preparatory measures Bonded waterproofing W1-I, W2-I and W3-I (wall and floor), 1,038 m
Wall mirror:
Wall mirror approx. 0.60 x 1.65 / 2.15 m (flush with the tiles), 49 pieces
Concrete stone:
Preparatory measures Concrete stone flooring, 3,200 m
Walk-off mat:
Walk-off flooring combination of rep and brush strips, total area approx. 110 m