19O20220 FHS police Rothenburg - upgrading accommodation building I and II
Power Installations
1 St. building main distribution; 66 St. subdistributor; approx. 3,200 m of cables and cables up to 5 x 50 mm 2 ; Approx. 70,000 m of cables up to NYM-J 5 x 2.5 mm 2 ; approx. 100 m cable tray; approx. 50 m parapet channel; approx. 2,750 St. AP / UP installation devices; about 1 800 St. lamps; 2 emergency lighting system with a total of 400 lights; Dismantling existing distributions, lights, cables and installation equipment; approx. 480 pc. core drillings; site power supply; Lightning protection system; Make Default: The CEAG make is currently in use in the portfolio of this property. It has been verified that this system enables future surface networking across the campus. This networking, or an extension of the safety lighting system, of all buildings, is realized within several construction projects. It is therefore imperative to specify a make for all measures.