Description:
Rypińska Purchasing Group. Electricity supply between 01.01.2022 and 31.12.2022

1. The subject of the contract is the supply of electricity between 01.01.2022 and 31.12.2022 to 517 points of consumption (PPE) with a total estimated volume (+/- 10%) of 6,439.17 MWh, of which:

1) For premises and facilities — (Part 1 of the order) — 5,407,88 MWh — detailed list of PPE is Annex 1a to SWZ

2) For road lighting purposes (Part 2 of the order) — 1 031,29 MWh — the detailed list of PPE is Annex 1b to SWZ.

2. The forecast electricity consumption indicated above is indicative and may deviate from the amount of energy actually collected, during the duration of the contract. Reducing or increasing the amount of electricity does not entail any consequences for the contracting (customers), other than the need to pay for the amount of energy actually collected.

3. Settlement periods used:

1) Tariff Group B, C2x — 1 m-c,

2) Tariff group C1x, G, R — 2 mce.

Supply of electricity to premises and facilities

1. Number of measurement systems accounting for electricity consumed 372 pcs

2. A detailed description of the pre-emptive points (PPE) of the Contracting Party included in Annex No 1a to the SWZ.

3. Estimated electricity consumption over the term of the contract 5,407,88 MWh, of which: Zone I - 3,649.40 MWh, Zone II - 1,758.48 MWh. The above data is indicative. The Contractor should take into account possible fluctuations in electricity consumption at a level of +/ -10%).

4. Deliveries will take place between 01.01.2022 and 31.12.2022, provided that the details of delivery dates (commencement and completion) for individual collection points are described in Annex No 1a to SWZ column “Delivery Period”.

5. Measurement systems with tariff group B are tailored to the seller's change procedure.

6. Current electricity supply contracts will expire or terminate with effect from the day preceding the planned delivery start date (column "Delivery period"). The obligation to terminate the contracts lies with the contracting authorities (recipients).

7. Quality standards

1) The subject of the order is the supply of electricity with certain quality standards in accordance with applicable regulations.

2) The quality standards of electricity are described in the Act of 10 April 1997 — Energy Law and the Regulation of the Minister of Economy of 4 May 2007 on the detailed conditions of the operation of the electricity system (Journal of Laws 2007, No. 93, item 623, as amended) and Regulation of the Minister of Energy of 6 March 2019 with amendments on detailed rules for the formation and calculation of tariffs and settlements in electricity trading (Journal of Laws of 2019, item 503 as amended).

8. CPV code under which the subject of the contract is classified: 09300000-2 - Electricity, thermal, solar and nuclear power, 09310000-5 — Electricity.

9. The Contractor shall, on the basis of the Power of Attorney granted, be required to notify on behalf of his own and the Contractor (recipients) of the contracts to the relevant DSO in accordance with the applicable rules and to represent the Contractor (recipients) before the DSO - the process of changing the seller.

10. The Contracting Authority reserves the possibility of taking advantage of Article 139 (1) of Pzp, i.e. the possibility of examining and evaluating tenders in the first place and then making the qualifications of the contractor whose offer has been highest assessed, in the absence of grounds for exclusion and fulfilment conditions of participation in the proceedings.

11. As a result of the settlement of the procurement procedure, 12 contracts will be concluded.

12. The Contracting Authority shall require the provision of a security of due performance of the contract. The Contractor shall lodge 12 security of the due performance of the contract separately for each contract concluded with the contracting authority.

13. The Ordering Party requests to bring a defect in the amount - Part 1 of the order: 65 000,00 PLN (words golden: sixty-five thousand 00/100).

Supply of electricity for the needs of road lighting

1. Number of measurement systems accounting for electricity consumed 145 pcs.

2. A detailed description of the pre-emptive points (PPE) of the Contracting Party included in Annex No 1b to the SWZ.

3. Estimated electricity consumption over the term of the contract 1 031,29 MWh, of which: Zone I - 397,37 MWh, Zone II - 633.92 MWh The above data are indicative. The Contractor should take into account possible fluctuations in electricity consumption at a level of +/ -10%).

4. Deliveries will take place between 01.01.2022 and 31.12.2022, provided that the details of delivery dates (commencement and completion) for individual collection points are described in Annex No 1b to SWZ column “Delivery Period”.

5. Current electricity supply contracts will expire or terminate with effect from the day preceding the planned delivery start date (column 'Delivery period'). The obligation to terminate the contracts lies with the contracting authorities (recipients).

6. Quality standards

1) The subject of the order is the supply of electricity with certain quality standards in accordance with applicable regulations.

2) The quality standards of electricity are described in the Act of 10 April 1997 — Energy Law and the Regulation of the Minister of Economy of 4 May 2007 on the detailed conditions of the operation of the electricity system (Journal of Laws 2007, No. 93, item 623, as amended) and Regulation of the Minister of Energy of 6 March 2019 with amendments on detailed rules for the formation and calculation of tariffs and settlements in electricity trading (Journal of Laws of 2019, item 503 as amended).

7. CPV code under which the subject of the contract is classified: 09300000-2 - Electricity, thermal, solar and nuclear power, 09310000-5 — Electricity.

8. The Contractor shall, on the basis of the Power of Attorney granted, be required to notify on behalf of the Contractor (s) of the contracts to the relevant DSO in accordance with the applicable rules and to represent the Contracting Party (s) before the DSO - the process of changing the seller.

9. The Contracting Authority reserves the possibility of taking advantage of Article 139 (1) of Pzp, i.e. the possibility of examining and evaluating tenders in the first place, and then making the qualifications of the contractor whose offer has been the highest rated, in the absence of grounds for exclusion and fulfilment conditions of participation in the proceedings.

10. As a result of the resolution of the public contract award procedure, 7 contracts will be concluded.

11. The Contracting Authority requires the provision of a security of sound performance of the contract. The Contractor shall provide 4 security for the sound performance of the contract separately for each contract concluded with the Contracting Authority, the Municipality of Golub-Dobrzyń and the Municipality of Brzuze.

12. The Ordering Party requests to bring a defect in the amount - Part 2 of the order12 000,00 PLN (words golden: twelve thousand 00/100).

Download full details as .pdf
The Buyer:
GMINA MIASTA RYPIN
CPV Code(s):
09300000 - Electricity, heating, solar and nuclear energy
09310000 - Electricity