The subject of the contract is the construction of the Zator bypass along the national road No. 28 (pilot project implemented using BIM methodology and tools)
The subject of the contract includes in particular:
preparatory works,
felling of conflicting trees and shrubs,
demolition of conflicting cubature objects,
demolition of fences,
photo of a layer of fertile soil – humus,
reinforcement of the substrate,
demolition of existing road surface structures together with markings and other road elements,
demolition and construction of exits,
construction of national road No. 28 together with the construction of an additional roadway,
reconstruction of national road No. 44,
extension of the old road of national road No. 28,
extension and construction of provincial road No. 781,
extension of the district road No. 1812K (Bugajska Street),
extension of the municipal road No. 510404K (Jana Pawła II Street),
construction of municipal roads and an additional roadway,
construction of sidewalks and pedestrian and bicycle paths,
construction and extension of single-level ordinary, canalized and roundabout crossings,
construction of engineering structures with accompanying elements,
construction and reconstruction of drainage ditches,
construction of road drainage – ditches, sections of rainwater sewage system with purification devices, retention tanks and outlets to drainage ditches, culverts,
construction of environmental protection devices, such as: acoustic screens, anti-glare screens, compensation tanks, retention tanks with access roads, settling tanks, separators, guiding fences,
construction and reconstruction of facilities and technical infrastructure equipment in the sanitary, electricity, teletechnical, structural and water and drainage industries,
implementation of horizontal and vertical markings and road safety elements,
construction of selected elements of the national traffic management system (m.in. technological channel, weather station),
construction of a lighting system with infrastructure,
construction of a bay for vehicle control by ITD and the Police,
construction of bus bays with bus shelters,
construction of a parking bay for the operation of purification devices,
plantings of greenery.
The subject of the contract will be carried out on the basis of the obtained ZRID decision using the BIM methodology and tools.