The competition applies to electrical, telecom and security planning with the other tasks included therein, as detailed below in the call for tenders and annexes. The project is aimed at the new building and renovation project of the Kalajärvi school, kindergarten and youth facility as described in the project plan and annexes.
Project Difficulty: Demanding
A preliminary project schedule is presented in the project plan. Changing the schedule does not justify the presentation of additional costs.
The City of Espoo Farm Services business is asking for your offer on electrical, telecommunications and security planning. The design work consists of a call for tenders and the design of the electrical, telecom, security and av system systems according to the design guidelines of the school and kindergarten as well as tasks related to the data model. Electrical design is performed within the scope of TATE18 task list and its appendices 1, 2.2 and 3 - summarizing the contract calculation documents, work and delivery drawings, maintenance section electrical part, data modeling and warranty issues. In addition, the designer prepares cost estimates at the L1 and L2 draft stages.
At the beginning of the design, the selected office must present a quality plan describing the organization, inspection and management of the task and the cooperation between the designers. The designer must, at the design stage, submit his plan for approval to the electrical engineering supervisor before the documents are sent to the contract calculator. The designer responsible for the design must check the workbook material before it is published and certify the inspection report with its signature. The design offer must include the design of temporary technical solutions for the school and the old day care center, as well as the design of the sports field and the service building. In addition, demolition planning for the A and B sections as well as the old nursery and group family daycare building. The Tenderer must submit persons from the Planning Team who are at least:
- Responsible electrical designer
- Telesigner
- Electrical designer
- Everyone's deputies.
Subscriber competes separately:
- Master and Architect Designer
- Structural designer
- Building Physical Designer
- HVAC designer
- Geo Designer.
(City Center / Geotechnics Acquisition):
- Kitchen Designer
- Acoustic Designer
- Interior Designer
- Fire engineer
- Data Model Coordinator
- Moisture and Cleanliness Control Coordinator
- Security Coordinator. The building project will be implemented as a complete contract or a split contract, where the multifunctional outdoor sports field will be competed as an option. Extent and details of the construction project according to the project plan. The car parking spaces, playgrounds and other activities of the project are placed on the school site. The design of the project is done by data modeling, in which case the design parties are required to have the knowledge of the data model as required by the data model guidance. The working language of the acquisition is Finnish and all documents are prepared in Finnish. Purchase documents in accordance with the invitation to tender and annexes.