The 1 Landschaftsbauarbeiten, The 2 Zaunbauarbeiten
LandschaftsbauarbeitenLandschaftsbauarbeiten
- Delivery and installation of filling floor ~ 1,275 m3
- Natursteinpflasterflächen (Basalt-Kleinstein) ~ 625 m2
- Concrete pavement road and parking areas ~ 505 m2
- Block steps made of natural stone ~ 100 m
- Trench with sedimentation system, dimensions 11.20 x 4.00 x 1.32 m
- Regenwasserleitungen ~ 170 m
- Organic edging elements for planting bed made of natural stone 44 m
- Pflanzflächen ~ 420 m2
- Lawns and meadows ~ 4,200 m2
- Disposal of rooted topsoil ~ 1,080 t
Fence construction workFence construction work
- Gittermattenzaun, 163 cm h ~ 55 m
- Sliding gates with electromagnetic drive 2 pcs.
- Dismantle and dispose of construction fences ~ 285 m