The city of Vilsbiburg is in the process of opening the Vilstalhalle (multi-purpose hall with 3 compartments, stage and grandstand)
to renovate and expand.
The construction period is scheduled from July 2023 to December 2025.
The work covers all trades of building construction.
In the course of the renovation of the Vilstalhalle, all sanitary facilities will be completely renewed. The
Drinking water is connected on site to the technical room, where the distributor is also set up. The
Hot water is provided by a fresh water station. The pipelines are used as
Stainless steel pipes executed. The dirty water pipes are made of PP and SML, the
Connection to existing and newly built underground pipelines. The sanitary fixtures and fittings
according to the usual standard.
approx. 800 m pipelines PP and SML
approx. 2 pcs floor drains
approx. 6 gutters
approx. 95 WC/urinal and washbasin modules
approx. 1 pcs underfloor lift system
approx. 900 m stainless steel pipelines
approx. 40 washbasins
approx. 3 pcs sink
approx. 42 pcs flushing toilet
approx. 14 pcs urinals
approx. 2 pcs WC barrier-free
approx. 7 pcs instantaneous water heater
approx. 8 pcs valves
approx. 53 pcs shower panel