The city of Cloppenburg operates a municipal sewage treatment plant with a high proportion of industrial dischargers (in total approx. 190,000 PE) and was last upgraded to the current state of the art in the course of the extensive 6th expansion measure. In addition to the usual sewage treatment of municipal sewage treatment plants, a strip plant and biofiltration (Biofor) are in use at the site.
Due to age, the aggregates of sludge dewatering (chamber filter press, daily sludge seizure average about 135 m
On the basis of an engineering preliminary investigation with regard to sustainable dewatering aggregates, centrifuges were developed as a preferred variant.
On the basis of the available documents, the planning process (mechanical engineering / E / MTR technology and buildings) for the renewal of sludge dewatering shall be started and accompanied until the final realization of the measure.
The performance picture of the engineering services according to the HOAI 2013 includes the following points:
HOAI 2013 - Part 4 Specialist Planning, Section 2 Technical Equipment (Object: Machine Technology and Object E / I & C Technology)):
- Extensive review of existing documentation regarding possible deficits related to the performance target of the benefit phase 1 and 2 according to § 55 HOAI 2013 i. V. m. Annex 15,
- Preparation of the previously identified deficits and completion of the documents, so that the performance phase 3 in accordance with § 55 HOAI 2013 i. V. m. Annex 15 can be properly planned,
- Implementation of LP 3 in accordance with § 55 HOAI 2013 i. V. m. Attachment 15, plus the special performance "Inventory on site with regard to relevant points that are important for the integration of new plant engineering and graphic incorporation of the findings in the inventory plans" and "Development of maintenance planning and organization",
- Execution LP 4 according to § 55 HOAI 2013 i. V. m. Annex 15,
- Implementation of LP 5 according to § 55 HOAI 2013 i. V. m. Annex 15 plus special performance "Inspection and approval of the structural designer's plans for compliance with slit and breakthrough planning",
- Execution of LP 6 according to § 55 HOAI 2013 i. V. m. Annex 15,
- Execution of LP 7 according to § 55 HOAI 2013 i. V. m. Annex 15,
- Execution of LP 8 according to § 55 HOAI 2013 i. V. m. Annex plus special services "Higher-level coordination of the other project participants, in particular the other object and specialist planning that will be carried out as part of the overall construction contract (applies only to the object of mechanical engineering)" and "Supplementary management wg. AG-side modified design",
- Execution of the LP 9 according to § 55 HOAI 2013 i. V. m. Annex 15 plus special services "Monitoring of the elimination of defects within the limitation period"
HOAI 2013 - Part 3 Object Planning, Section 1 Buildings and Interiors,
- Extensive review of existing documentation regarding possible deficits related to the performance target of the benefit phase 1 and 2 according to § 34 HOAI 2013 i. V. m. Appendix 10,
- Preparation of the previously identified deficits and completion of the documents, so that the performance phase 3 in accordance with § 34 HOAI 2013 i. V. m. Annex 10 can be properly planned,
- Implementation of LP 3 in accordance with § 34 HOAI 2013 i. V. m. Annex plus the special performance "Inventory on-site including comparison with the existing documents" as well as "graphic incorporation of the findings into the existing plans",
- Implementation of LP 4 in accordance with § 34 HOAI 2013 i. V. m. Appendix 10,
- Carrying out LP 5 in accordance with § 34 HOAI 2013 i. V. m. Appendix 10,
- Implementation of LP 6 in accordance with § 34 HOAI 2013 i. V. m. Appendix 10,
- Execution LP 7 according to § 34 HOAI 2013 i. V. m. Appendix 10,
- Carrying out LP 8 in accordance with § 34 HOAI 2013 i. V. m. Annex 10 plus special services "Supplementary Management",
- Carrying out LP 9 according to § 34 HOAI 2013 i. V. m. Annex 10 plus special services "Monitoring of defect elimination within the limitation period".