Procurement is divided into three phases:
1. Engineering
2. Realization
3. Maintenance
Engineering of a heavy-duty warehouse for long goods and large components is a fully automated warehouse for parts that do not fit on a Euro pallet in terms of length and width. These parts are therefore larger than 1'200mmx800mm and weigh up to 5'000 kg. The
maximum dimensions are specified at 5'000 x 1'800mm x 1'000mm. It can also be stored several next to each other, or a zu-storage, made to a free place.
- Loading and unloading from the system load carrier is done via forklifts.
- Dynamic performance = 25 double games (storage/retrieval per hour) during 16 h per day / Monday - Friday
Size of the facility (building):
- Available length = 49 m
- Available width = 16 m
- Available height = 17 m
FOR FURTHER INFORMATION SEE CLAUSE 4.6
Procurement is divided into three phases:
1. Engineering
2. Realization
3. Maintenance
Engineering of a heavy-duty warehouse for long goods and large components is a fully automated warehouse for parts that do not fit on a Euro pallet in terms of length and width. These parts are therefore larger than 1'200mmx800mm and weigh up to 5'000 kg. The
maximum dimensions are specified at 5'000 x 1'800mm x 1'000mm. It can also be stored several next to each other, or a zu-storage, made to a free place.
- Loading and unloading from the system load carrier is done via forklifts.
- Dynamic performance = 25 double games (storage/retrieval per hour) during 16 h per day / Monday - Friday
Size of the facility (building):
- Available length = 49 m
- Available width = 16 m
- Available height = 17 m
FOR FURTHER INFORMATION SEE CLAUSE 4.6