Passage renewal in the railway embankment of the DB and construction of construction roads.
Building site roads:
- BE - / BR for construction roads and culverts,
- approx. 1 140 h security and closure surcharge night work,
- about 1 800.00 m
- about 6 600.00 m
- about 9 400.00 m
- about 10 900.00 m
- about 4 800.00 m
- approx. 2,000.00 m
- about 32 150.00 m
- about 6 000.00 m
- produce approx. 28 250.00 to Schott carrier layer,
- produce approx. 1 100.00 to asphalt wearing course AC 16 TD,
- approx. 70,00 to Asphalttragsch. Produce AC 32 TN,
- about 20.00 to Asphaltdecksch. Produce AC 11 DN.
Dewatering on site roads:
- make about 2 250.00 m hollow,
- make a 550 m trench,
- manufacture / open approx. 100.00 m DN 200 PE-HD,
- About 2 200.00 m seepage herst. m. Earthworks.
Renewal of old frame culverts with new culverts:
- about 865.00 m
- supply approx. 250.00 m jacking pipes DN 1200 SB, carry out pipe jacking for DL 1 + 2 + 5 + 6 + 7,
- supply approx. 150.00 m jacking pipes DN 1400 SB, carry out pipe jacking for DL 3 + 4,
- Deliver approx. 60.00 m jacking pipes DN 1990 SB, carry out pipe jacking for DL 8.
Other services to be performed:
- traffic safety according to rule plans for shorter and longer duration aufst. u. derivative,
- Preservation of public roads,
- Preservation of evidence of the railway including ancillary facilities,
- produce protection for tree trunks,
- mowing vegetation areas,
- Clearing deforested forest and rhizomes,
- make construction pits,
- produce antifreeze coatings,
- Evaluate concrete incl. Formwork,
- remove shafts,
- deliver and install finished parts for manholes,
- make shaft connections,
- make connecting cables,
- Supply and install plastic piping PE-HD DN 150 - 400.