Conversion of the Blomberg school center to a secondary school - gutting work
The main and junior high schools are converted into sections in secondary school.
The Hauptschule and Realschule will be converted into a secondary school in sections. BT-D: 3rd refurbishment section, 3-storey structure, approx. 1,500 m 2 Usable area dismantling of: MW walls (approx. 11 m³), plasterboard walls / pre-walls (approx. 116 m 2 ), Interior doors including steel frames, interior ceilings (approx. 1 537 m 2 ), Ceilings outside area (approx. 216 m 2 ), Floor coverings (approx. 1 120 m 2 ), Built-in wardrobes etc ..