Avinor shall expand central areas at Stavanger Airport Sola (USO1). The expansion consists of expanding the departure hall and storage building which has already begun, as well as expanding the arrivals and customs area (this announcement). The area of the new building is approx. 4 500 m2 divided in three floors of various sizes.
This contract comprises a complete electrical Installation works, with both electric power and telecommunication systems in the arrival area, a new building and reconstruction.
The electric power installation works includes i.a.:
— Disassembly and alteration/temporary installations;
— Basic installations: Conveyance paths for cable ladders and installation ducts;
— Earthing system;
— Low voltage supply: Inlet, main distribution boards, riser cables, sub distribution boards, circuit systems for all electric power installations;
— Lighting: Delivery and installation of lighting equipment;
— Backup power supply: UPS for ICT.
The telecommunication and automations works include i.a.:
Disassembly and alteration/temporary installations
— ICT: Complete cabling system, excluding switches, etc.
— Fire alarm systems: Cabling and installation. The equipment is delivered by Avinor through a framework agreement
— Access control: Mainly circuit systems.
— ITV, LETIS: Mainly circuit systems.
— PA-system: Delivery and installation of a complete system
— Automation: Mainly circuit systems.