New construction of 3 apartment buildings with 44 residential units 2.BA “Am Bailey Park 3, 3A, 3B” in Hamelin road and landscaping works
Lot 1: Landscaping and paving works:
approx. 2,600 m² of paving work, approx. 1,050 m. Concrete shelves planting work:
approx. 17 pcs trees, approx. 1000 pcs Hedge plants, shrubs and perennials approx. 1,800 m² of vegetation and lawns produce drainage facilities:
approx. 50 running metres Line drainage, approx. 17 pcs Point flow of installations in outdoor facilities:
approx. 13 pcs Bicycle racks, 10 large garbage boxes, 8 benches, 1 wooden deck Lot 2 and 3: Road construction work expansion of asphalt areas 625 m².
Milling asphalt surfaces 1,450 m².
Expansion of board systems 80 m.
Expansion of one- to three-row gutters 60 m.
Expansion of unbound superstructure layers 250 m³.
Make planum drainage 80 m.
Set road runs and connect to channels 3 pcs
Installation of unbound base layers 205 m³.
Make paving ceiling 940 m².
Asphalt bases produce 660 m².
Produce asphalt top layer 1,830 m².
Install tree substrate 250 m³.
installation of topfloor 60 m³.
Planting 14 solitaire trees including growth and completion care.