Plumbing and sanitary works | Tenderlake

Plumbing and sanitary works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
12 May 2021
Closing Date:
11 June 2021
Location(s):
PL911 Miasto Warszawa (PL Poland/POLSKA)
Description:
ZP/CZD/040/21 Adaptation of premises in building D for the needs of the Environmental Center for Mental Health for Children and Adolescents in the “Institute Monument — Center for Child Health”, in the mode of design and in the...

The object of the order is the adaptation of the premises in Building D for the needs of the Environmental Mental Health Center for Children and Adolescents in the “Monument Institute — Child Health Center”, in the mode of “design and build”.

The Contracting Authority, pursuant to Article 257 of the Pzp Act, provides for the possibility of annulment of this procurement procedure in the event of failure to grant public funds intended to be intended to finance all or part of the contract.

The order and the PFU concerns the adaptation of existing premises in Building D for the Environmental Centre for Mental Health for Children and Adolescents “Monument — Child Health Centre” and the execution of full design documentation for the above range of works, obtaining the necessary permits, and conduct receipts.

Functional-utility assumptions:

The aim of the action is to design on the basis of the concept presented and create a room for the needs of the Environmental Mental Health Centre for Children and Adolescents.

The design concept includes remodeling of the surface according to the needs of the investor — redevelopment involves the construction of new partitions creating a new functional layout according to the requirements of the future user.

On the surface in question will be created cabinets of psychologists for individual and group work. Hygiene-sanitary facilities were also planned. When rebuilt, the net usable area (without partitions) will be 284.9 m2. Only building work related to the redevelopment of interiors is envisaged. There are no changes in the scope of the building solid (changes to the building's stroke or exterior changes) and changes to the structure of the building.

The rooms on the ground floor are fully accessible for the disabled: an adapted lift from all levels of the building, suitable and in accordance with the technical conditions of the width of the doors and transport strings. Inside, there are no thresholds or degrees. There is also a toilet on the floor in question that meets the requirements of the disabled toilet.

As part of the execution of the order, the necessary design documentation should be developed, in accordance with the applicable regulations and requirements when receiving premises by the Authorities of the State Administration, including, among others, Sanepid.

The task is to be completed as comprehensive and complete, transmitted to the Contracting Authority, together with the necessary receipts to enable the operation of the turnkey studio without incurring additional costs by the Contracting Authority. The task does not include movable equipment in addition to furniture for the development.

Download full details as .pdf
The Buyer:
Instytut „Pomnik – Centrum Zdrowia Dziecka”
CPV Code(s):
45232460 - Sanitary works
45311000 - Electrical wiring and fitting work
45314000 - Installation of telecommunications equipment
45316000 - Installation work of illumination and signalling systems
45317000 - Other electrical installation work
45320000 - Insulation work
45321000 - Thermal insulation work
45330000 - Plumbing and sanitary works
45400000 - Building completion work
71220000 - Architectural design services