Implementation of a peak load management and energy monitoring system at Leipzig / Halle Airport.
Load management - Telecontrol integration of the meters, CHP, NEAs, loads across several
Independent telecontrol / automation focus - expansion of the network control system
- Integration of the CHP,
- Control of NEAs (already integrated in the existing system),
- Connection of switchable loads via converter solution,
- project management / concept clarification,
- Creation of specifications and parameter lists,
- hardware and software configuration,
- implementation of load management,
- Implementation of the "Atypical network use" function,
- coupling to the energy management system,
- Commissioning and documentation of the energy management system - Setting up the software proxy,
- Creation of a data point list,
- Adaptation of the format export file,
- initial workshop,
- Development of an evaluation concept,
- initial engineering,
- Customer briefing
Asset Performance Monitoring - cyclical monitoring of technical systems
- Regular reporting and presentation of energy consumption,
- Support in the energetically optimal operation of the systems,
- Cross-project communication and interface clarification with the installer of the LZG renewal projects and updates for the station and network control technology.,
- Network analysis of the existing supply network,
- The remuneration should be based on a gain share model.