Supply of pre-insulated materials for construction works consisting in the construction of a heating network and connection of heating networks as part of the decommissioning of group hubs — Grochowska 234/240 (no. 39).
The detailed scope of the order is described in the Detailed Description of the Order Item and in the accompanying documentation of the SWZ.
Supply of pre-insulated materials for construction works consisting in the construction of a heating network and connection of heating networks as part of the decommissioning of group hubs — Grochowska 234/240 (no. 39).
As part of the task: Construction 2.43 km and modernization of 2.81 km of heating networks and connection of heating networks as part of the decommissioning of 13 group hubs.
Within the framework of the project: Decommissioning of group nodes together with the construction of heating network and individual heat hubs in areas of compact multi-family buildings in areas with exceeded permissible levels of air pollution — Individual nodes for Warsaw — Stage II, Axis Priority And Reducing the emissivity of the economy, Action 1.5 Effective distribution of heat and cold, POIS.01.05.00-00-0034/16.