The service includes civil engineering, pipe construction and cable construction work for gas/water/electricity house connections
in the supply area of Stadtwerke Ingolstadt Netze GmbH.
NEW CONSTRUCTION of house connections for all pipe diameters up to DN 50/ da 63, power cables up to
a cross-section of 150 mm² and telecom and broadband cables up to 10 DA professionally as
Multi-division (MSH), single or combined house connection with different divisions
and pressure stages (MOP 5 for gas) ready for operation, including all necessary civil engineering and assembly work in the supply area of Stadtwerke Ingolstadt Netze GmbH.
Materials and components:
Unless otherwise mentioned in the performance items, the material for the
Pipeline construction by the AG from the storage location of the utility company (Ringlerstraße 28 in
85057 Ingolstadt). The Contractor shall deliver this material to the construction site
transport. The costs of pipe transport are to be included in the unit prices.
Archaeological accompaniment:
Both the archaeological accompaniment of a construction project and the monitoring of the
Civil engineering work by an excavator supervisor in accordance with the Explosives Act is carried out by the
AG. The Contractor shall coordinate this work and comply with the instructions
achieve. Downtimes caused to the Contractor by accompanying work shall be carried out without
written consent of the Client is not remunerated (see hourly wage work).
The contractor has to coordinate his work in such a way that there are no downtimes.
Traffic safety:
The contractor has the sole traffic safety obligation on the construction site and is liable for
all damages caused by violation of his traffic safety obligation. He takes over
in this respect also the traffic safety obligation of the client and is liable in relation to the
Client to third parties alone. The Contractor shall provide the Client with all
Claims of third parties due to violation of the traffic safety obligation, insofar as the
Contractor is responsible for or responsible for the violation of the traffic safety obligation
has. Pollution of access roads and paths caused by the Contractor are due to
Costs of the Contractor to be adjusted.
Hourly wage work:
According to § 15 No. 3 sentence 1 VOB/B, the contractor must inform the client of the execution of
Display hourly wage work before it begins, so that the client has the required for him
Control can exercise. According to § 15 No. 3 sentence 2 VOB/B, the contractor has informed the client
on hours worked and the necessary remuneration
Expenditure for the consumption of substances, provision of equipment, equipment, etc.
Submit hourly pay slips, unless otherwise agreed, depending on the
Traffic customs on weekdays. Night and Saturday work will only be carried out on the instructions of the
AG. The construction work performed will be charged.
Self-organization of the handling of the house connection creation:
Examination of the offer for technical execution, in case of discrepancy feedback to the client
• Weekly order list is transmitted to AN by the Client
• Appointment with the customer for viewing appointment (on-site appointments incl. conducting the
Appointment list), execution date, traffic law order and
Materialbedarfsermittlung
• Contact person for customers in case of change of the specified dates for construction
• Execution of the viewing appointment in the standard case
• Determination of the final execution date
• Preparation and obtaining of the switching permit
• Determination and recording of the advance services to be provided by the customer on the
Besichtigungsformular, with.B. Baufreiheit
• Determination and recording of additional wishes or changes in the
Customer order at the instigation of the customer or local or technical
Necessity. Changes will be recorded on the viewing form.
Permissible "changes" by AN: * Length change up to 4 m *
No fundamental path change permitted, i.e. house front as offered, or the same
Room in compliance with the permissible change of length in order * Estimated price to customers
Release of the change up to 4 meters by note and signature by
Customer on "Viewing Form".
Integration AG: * In case of necessary changes to the route/length greater than 4 m *
Examination of changes according to technical regulations Release of the change up to 5,000 €
by note and signature by customer on "viewing form".
• Fill in the material list and hand it over to the client with a required date
• Application for switching permits for electricity/gas/water
• customer contact on the construction site
• adherence to the specified construction date and the recording of the reasons in the case of
Date deviation on the viewing form if possible with
Customer signature (burden of proof) the recording and documentation (also by means of
Photographs) of events and difficulties, disabilities, etc. on the construction site
Personnel strength civil engineering / machinery:
4 construction crews are to be provided
Equipment of a construction column with:
Wheeled excavators up to 7.5 t,
Truck 7.5 t, if required truck > 7.5 t, compressor, electricity, gas and water fitters in
sufficient number.
Ancillary equipment:
The use of additional machines such as.B suction excavators, crane trucks, pipe trailers,
Joint cutters, compaction devices is compatible with the application of unit positions
Shafting, backfilling or material transport compensated.