Construction of a new mobile rectifier plant in steel container construction
Delivery and installation of the mobile rectifier plant as an overall concept.
Necessary transport permits or road closures are required by the
contractor to apply to the respective authorities at an early stage.
The introduction of the DC, feeder and return cables into the building
is the responsibility of the client. The introduction of the above-mentioned cables up to the
The connection point in the switchgear is the responsibility of the contractor, as is the
Connect to the negative rail or to the respective track exit. The
Medium-voltage mains connection as well as a 400 V AC house connection is made
by the Wesernetze Bremen. Both the medium-voltage and low-voltage cables are to be laid in bundles, whereby the cables are to be brought together directly behind the respective outlets in a short distance. As a result, the fields occurring in the area of the cable trays are greatly reduced. In order to obtain the best reduction, both the medium-voltage cables and the low-voltage cables must be laid separately on top of each other, in the order: L1.1 - L2.1 - L3.1 and below L3.2 - L2.2 - L1.2.