The municipality of Sennfeld intends to build a new elementary and secondary school in Sennfeld. As part of this procurement procedure, the property planning services for buildings and interiors, service phases (LP) 1 to and including 9, in accordance with Section 34 (3) HOAI, are to be commissioned in stages, including the following special services:
- Advice on alternative options/solutions for the heat supply of the new building (LP 2)
- Participation in the grant application (LP 2)
- Set up a room book (LP 2)
- update of the room book (LP 3)
- update of the room book, including detailed/planning presentation (LP 5)
- Contribute to the review of supplementary offers based on construction reasons (LP 7)
- Contribute to the creation of the where-used list (LP 8)
- Contribute to funding accounting (LP 8)
- Monitoring the rectification of defects within the limitation period (LP 9)
The municipality of Sennfeld intends to build a new elementary and secondary school in Sennfeld. As part of this procurement procedure, the project planning services for buildings and interiors, service phases 1 to 9 inclusive, are to be commissioned in accordance with Section 34 (3) HOAI.
The play and soccer field in the municipality of Sennfeld is planned as a location for the new building. Due to the old stock of trees there and the size of the property, tree- and space-saving planning is required. The playground on this property should either be preserved and separated from the school grounds by appropriate asphalting, or can also be relocated in coordination with the municipality. According to the already available soil report, a pile foundation must be carried out for the new construction. In addition, it must be taken into account when planning that sufficient parking spaces are available and that a connection to bus transport is ensured.
In addition, the employer intends to operate the new building to be erected in an energy-neutral manner. Against this background, a key aspect in the first two HOAI service phases is advising the client together with the specialist planners with regard to deciding whether
- integrated a local heating centre into the new building complex as its own energy source, or
- a separate building is to be built for the local heating centre that is to supply the new building, or
- a local heating supply is not even an option or is needed.
Therefore, in the architectural contract, the client already expressly reserves the right to commission the contractor with the planning services with regard to the construction and/or integration of a local heating center by unilateral retrieval, if and to the extent that property planning services for buildings and interiors are required for this purpose .
The specialist planning services for technical building equipment (HLS and ELT) are also tendered in separate procurement procedures.
The cost estimate currently foresees construction costs of approximately EUR 17 million gross for cost groups 200 to 700.
The replacement new building is expected to be completed by 30.06.2026.