The contract involves planning, manufacturing, delivering and assembling a new wastewater collection station (Chemie III) in Room B001 and a new ventilation system for the Rooms B001 and B002 in Wing B (JRC Karlsruhe).
It does not involve dismantling the current wastewater collection station and its components. Once these new facilities have been installed, the current floor inlets must be sealed. The control panel for the wastewater collection station shall be installed in room B035. The ventilation system shall be controlled by the existing ventilation control panel in room B023.
Implementation of renovation and replacing the ventilation system and the wastewater collection station in Wing B