As part of the renovation of the BAB 555 in the Wesseling area, a new noise barrier is to be built in the 2nd BA in FR Bonn.
An existing noise barrier is to be retrofitted at the same location.
Produce approx. 2,600 m2 noise barrier
produce approx. 470 m bored piles (98 pcs)
approx. 4,900 m3 earthworks/earthmoving
1 st to produce torsion bar
1 pcs of rolling shutter door
590 m2 present Remove wall elements incl. Demolition of foundation