Locksmith work for the renovation and conversion of a primary school
- 150 m railing elevation, handrail, stainless steel, round tube
- 43 m handrail, flat steel, according to construction time. Making a prototype
- 10 pcs. climb protection, steel frame glass up to 3.2m /0.75m
- 27 m construction time. Refurbishing and assembling railings
- Refurbish 22 cellar light shaft covers from the time of construction
- 10 pcs. cellar light shaft covers according to construction time. Making a prototype
- 1 pcs. steel outer ramp with intermediate platform, l= 13.6 m
- 1 pcs. steel outer ramp, l= 6.0 m
- 43 m handrail, stainless steel, round tube
- 1 pcs. flagpole clock tower, l=10.3 m
- 19 pcs. fall protection roof terrace according to construction time. Prototype, 2.4/1.3 m
- 3 pcs. analysis lead mennige