The municipality of Margetshöchheim is currently carrying out a general renovation of the primary and secondary school with gymnasium. This will be renovated over various construction phases. Construction phase 1 has already begun and is currently being implemented. The technical equipment had to be staffed on an interim basis at short notice after insolvency proceedings. For the further construction phases 2-5, an accelerated award procedure will be carried out for the award of the planning services LPH 5-9.
The cost calculation according to DIN 276 for the KG300 for the renovation of sections A, B, C, V is € 5,555,301.02 net and for the renovation of the gymnasium € 1,845,227.90 net.
The cost calculation according to DIN 276 for KG 400 for the renovation of sections A, B, C, V is € 2,258,068.37 net and for the renovation of the gymnasium € 496,600.57 net.
The measure is funded by the government of Lower Franconia.
A two-stage negotiation procedure will be carried out with a public participation competition and negotiation phase for planning services HOAI 2021 Technical Equipment Part 4 Section 2 §§ 53, 55 Work phases 5-9 for plant groups 4 and 5.
As a special service of LPH 5, the incorporation of the results of the structural design into the slot and breakthrough planning is commissioned.
As a special service of the LPH 8, the performance of performance measurements and functional tests is commissioned.
The commissioning according to HOAI Technical Equipment Part 4 Section 2 §§ 53, 55 Work Phases 5-9 for Plant Groups 4 and 5 is intended as follows:
The commissioning of the 1st stage with the service phase 5 takes place for all construction phases
The commissioning of the 2nd stage for work phases 6 and 7 is carried out separately for the respective construction phases
The commissioning of the 3rd stage with the work phases 8 and 9 is also carried out separately for the respective construction phases
In addition, the two-stage negotiation procedure with public participation competition and negotiation phase for planning services HOAI 2021 Technical Equipment Part 4 Section 2 §§ 53, 55 also includes service phases 1-3 and 5-9 for plant group 4 PV system.
The commissioning for the EGR 4 PV system will also be carried out in stages. Initially, LPH 1-3 and 5 are to be commissioned for the EGR 4 PV system. LPH 6 and 7 as well as LPH 8 and 9 can be ordered as an option.
The client decides on further commissioning of the performance levels in the further planning process. No claims for the transfer of further performance levels or further services can be derived from phased commissioning.
With the entry into force of the new HOAI 2021 version on January 1, 2021, the obligation to minimum and maximum rates has been removed. The fee tables of HOAI 2021 show orientation values.