Fire protection renovation ZDF Mainz high-rise building - main measure
The ZDF administration high-rise in Mainz must be upgraded in terms of fire protection. The overall measure is divided into 16 construction phases (office floors). The construction phases advertised here will be carried out from the end of April 2020-August 2025.
Here: plaster and drywall walls.
Lot 1 - walls / cladding:
- approx. 2 360 m
- approx. 600 m
- approx. 20 m
- approx. 45 m
- about 1 620 m
- about 155 m
- approx. 162 m
- approx. 270 m corner protection rails, steel, galvanized 25/25 mm,
- approx. 270 m corner protection rails, steel, galvanized 30/30 mm,
- approx. 45 m sheet steel profile U-shaped D = 3 mm,
- approx. 155 m sheet steel profile U-shaped D = 2 mm,
- approx. 175 m
- approx. 140 m
- approx. 30 m
- approx. 45 m
- approx. 95 m
- approx. 380 m
- approx. 60 lintel / partition combination with square hollow profile,
- approx. 75 reveal with square hollow profile,
- approx. 205 m of line clothing, 3-sided different developments,
- make approx. 100 openings in the ceiling of various sizes,
- approx. 14 230 m
- make approx. 1,500 openings in new ceiling tiles of various sizes,
- approx. 15 m
- approx. 1 300 seals in the floor cavity F60,
- approx. 360 pieces of temporary partition wall openings of various sizes,
- adjust approx. 800 double floor supports,
- add approx. 600 double floor supports,
- approx. 820 m
- approx. 540 m adhesive bridge on reveal / lintel W = 24 cm,
- approx. 515 m
- approx. 270 m
- approx. 500 m bottle of internal plaster B approx. 7 cm,
- approx. 540 m plastering door frames,
- approx. 700 m aluminum end profile,
- approx. 900 m edge protection profile,
- approx. 90 m reinforcement mesh in individual lengths,
- approx. 785 m