The assignment concerns the construction of a new switching station 130kV on new land. Station which connects to 4x 130kV wires. Line connections will take place in two stages.
Broadly speaking, the substation shall consist of ten (10) double switch bays 130kV, two (2) busbars, two (2) busbar compartments, a station building, a backup power unit and a substation. In the station building, all control and relay protection systems are installed for a complete facility.
The new station site is located about 2km east of Mariestad. The property is partly cleared by the Client. Further forest clearing will be required and will be included in the contract.
Broadly speaking, the substation shall consist of ten (10) double switch bays 130kV, two (2) busbars, two (2) busbar compartments, a station building, a backup power unit and a substation. In the station building, all control and relay protection systems are installed for a complete facility.
Line connections will take place in two stages.