Construction work for water and sewage pipelines | Tenderlake

Construction work for water and sewage pipelines

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
04 May 2021
Closing Date:
04 June 2021
Location(s):
PL228 Bytomski (PL Poland/POLSKA)
Description:
Construction of sanitary and rain drains in the area of the commune Świerklaniec — stage III Nakło Śląskie part 2

The object of the investment is the construction of sanitary sewerage system, together with the construction and reconstruction of the necessary infrastructure in the scope of the northern part of Nakło Śląski. The route of the sewerage system runs within the Świerklaniec municipality in Nakło Śląskie, along streets including: Main, Friendship, Gościnna, Obłoków, Wąska, Górna, Szerokiej, Grzegorza and Kamienna.

Summary of the length of the designed networks:

1. Sanitary sewerage — 3,649.0 m;

2. Rainwater sewer — 923.5 m;

3. Water supply network — 1,430.0 m.

A detailed description of the object of the order is the design documentation, which is Annex 1 to the SWZ.

The object of the investment is the construction of sanitary sewerage system, together with the construction and reconstruction of the necessary infrastructure in the scope of the northern part of Nakło Śląski. The route of the sewerage system runs within the Świerklaniec municipality in Nakło Śląskie, along streets including: Main, Friendship, Gościnna, Obłoków, Wąska, Górna, Szerokiej, Grzegorza and Kamienna.

The scope of the study includes:

1. construction of a sanitary sewer network with the construction of branches to the boundaries of adjacent property;

2. construction and reconstruction of the water supply network with connections to plots and recreation of sections degraded during construction works;

3. construction, reconstruction and repair of the rainwater sewer network, together with beads for street inlets and recreation of sections degraded during construction works;

4. the construction of cover pipes on existing cables;

5. reconstruction of the teletechnical network with the construction of the shielding pipes on existing cables.

6. refurbishment with the recreation of the road surface;

7. Decommissioning of closed networks.

Summary of the length of the designed networks:

1. Sanitary sewerage — 3,649.0 m;

2. Rainwater sewer — 923.5 m;

3. Water supply network — 1,430.0 m.

A detailed description of the object of the order is the design documentation, which is Annex 1 to the SWZ.

Download full details as .pdf
The Buyer:
Gmina Świerklaniec
CPV Code(s):
45000000 - Construction work
45100000 - Site preparation work
45111200 - Site preparation and clearance work
45111240 - Ground-drainage work
45111291 - Site-development work
45200000 - Works for complete or part construction and civil engineering work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45231100 - General construction work for pipelines
45231300 - Construction work for water and sewage pipelines
45231400 - Construction work for electricity power lines
45232000 - Ancillary works for pipelines and cables
45232130 - Storm-water piping construction work
45232410 - Sewerage work
45232423 - Sewage pumping stations construction work
45232440 - Construction work for sewage pipes
45233142 - Road-repair works
45233200 - Various surface works
45236000 - Flatwork
45310000 - Electrical installation work