EMEC wish to appoint a contractor to design and build a mobile Hydrogen Refueller that is capable of delivering up to 100 kg of Hydrogen at 350 Bar to the HyFLYER II Project.
EMEC wish to appoint a contractor to design and build a mobile Hydrogen Refueller that is capable of delivering up to 100 kg of Hydrogen at 350 Bar to the HyFLYER II Project. The refueller shall be capable of delivering the hydrogen at multiple locations but will primarily operate at Cotswold Airport in the UK (also known as Kemble Airfield). The refueller commissioning shall start no later than June 2022 and be fully operational by no later than October 2022.