Acoustic plaster on cross vaults in the existing building (cultural monument).
Acoustic plaster cross vault in the existing building (cultural monument):
approx. 900 m² acoustic spray spatula system "FLEXO-PANEL" with smooth-ground and invisibly repairable acoustic spray spatula on existing cross vault
For components with minimum technical requirements (fire protection, sound insulation, etc.), test certificates and installation certificates must be submitted.
The execution of the work is expected to extend over 3 months (December 2022 to February 2023).
Due to complex dependencies, continuous processing cannot be assumed.