Candidates may visit the contract performance sites before submitting their tender under the conditions set out in article 2.10 of the consultation regulations. The proposal of optional variants is authorized but limited under the conditions provided for in the consultation regulations. The proposal of imposed variants is not foreseen. The contract does not include any additional services (PSE). The operation is divided into lots, each lot being the subject of a separate market.
Demolition, asbestos removalDemolition, asbestos removal.
Painting - resilient floor coveringsPainting - resilient floor coverings.
TilesTiles.
Electricity - strong and weak currentsElectricity - strong and weak currents.
ElevatorElevator.
Heating - ventilation - sanitary plumbingHeating - ventilation - sanitary plumbing.
Temporary modular buildingsTemporary modular buildings.
VRD, green spaces, fencesVRD, green spaces, fences.
Structural work - renovationStructural work - refurbishment.
Timber cladding frameTimber cladding frame.
Waterproofing coverWaterproofing cover.
Exterior joinery - locksmithsExterior joinery - locksmiths.
Double wallsDouble walls.
Interior joineryInterior joinery.
False ceilingsFalse ceilings.