Lot 11 screed.
The contractor is to produce a cement screed in living areas as well as in the stairwells and hallways, the total service consisting of:
- Preliminary work, cleaning on the entire screed surface:
—— approx. 4 640 m
- Thermal insulation EPS, WLG 035 in different thicknesses, depending on the floor structure:
—— approx. 160 m
- approx. 3 470 m
—— approx. 160 m
—— approx. 20 m
—— approx. 830 m
- Impact sound insulation EPS, WLG 045 on the entire thermal insulation:
—— approx. 4 640 m
- Cement screed in 2 classes, depending on the floor structure:
—— approx. 4,220 m
—— approx. 415 m