A 3 Nuremberg - Passau, 6-lane expansion of AK Regensburg - AS Rosenhof, replacement building BW 68.
A 3 Nuremberg-Passau, 6-lane expansion of AK Regensburg-AS Rosenhof
Replacement building BW 68
- Spans in axis: 30.267 m + 30.267 m;
- Total span: 60.534 m;
- Clear widths: 26.50 m / 26.50 m;
- Smallest clear height:> 4.70 m above A3;
- Crossing angle: 73.753 gon;
- Width: 4.25 m + 8.50 m + 2.05 m;
- Total width between the railings: 14.30 m;
- Construction type of superstructure: 2-span, 2-web prestressed concrete T-beam in in-situ concrete;
- Bridge area: approx. 865 m
- Foundation of flat foundation.
The services essentially include:
- Demolish existing structure: 1 piece;
- Temporary bridge: 1 piece;
- Spans: 53.60 m (depending on the system);
- Remove topsoil: 1,865 m
- Cover topsoil: 1,865 m
- Loosen soil: 24 700 m
- floor u. Building. deliver: 22 650 m
- Remove the frost protection layer: 1 100 m
- Create the FSS frost protection layer: 1 950 m
- Milling asphalt: 3 500 m
- Create asphalt base course: 3 400 m
- Prepare asphalt binder course: 1,600 m
- Prepare asphalt surface course: 3 870 m
- Concrete: 1,960 m
- Reinforcing steel B 500B: 260 t;
- Prestressing steel St 1660/1860: 20 t;
- Reinforcing steel B 500 B no: 12 t.