Pipeline-design services | Tenderlake

Pipeline-design services

Contract Value:
PLN 100K - 100K
Notice Type:
Contract Notice
Published Date:
11 May 2021
Closing Date:
15 June 2021
Location(s):
PL418 Poznański (PL Poland/POLSKA)
Description:
Development of the Project with obtaining a legitimate decision of permission for the construction of the water supply network and the fulfillment of the copyright supervision — Murowana Goślina — water supply network in Wojnów

The object of the contract is to develop a project in accordance with the applicable Construction Law (project documentation including land-use, architectural and construction and technical design) for the construction of: water supply network with connections in the village of Wojnowo within the task investment No 3-04-17-198-0 Murowana Goślina — water supply network in Wojnów, together with obtaining the legitimate decision of the construction permit;

and

performing author's supervision during the implementation phase of works carried out on the basis of the documentation being the subject of the contract from the day of concluding the contract with the Contractor of construction works until signing the final acceptance protocol of these works.

As part of the author's supervision should be provided:

- supervision cards with stay at the construction site - 5 supervision cards,

— supervision cards without a stay at the construction site — 5 surveillance cards,

— total of all surveillance cards 10.

The object of the contract is to develop a project in accordance with the applicable Construction Law (project documentation including land-use, architectural and construction and technical design) for the construction of: water supply network with connections in the village of Wojnowo within the task investment No 3-04-17-198-0 Murowana Goślina — water supply network in Wojnów, together with obtaining the legitimate decision of the construction permit;

and

performing author's supervision during the implementation phase of works carried out on the basis of the documentation being the subject of the contract from the day of concluding the contract with the Contractor of construction works until signing the final acceptance protocol of these works.

As part of the author's supervision should be provided:

- supervision cards with stay at the construction site - 5 supervision cards,

— supervision cards without a stay at the construction site — 5 surveillance cards,

— total of all surveillance cards 10.

Download full details as .pdf
The Buyer:
„Aquanet” S.A.
CPV Code(s):
71248000 - Supervision of project and documentation
71320000 - Engineering design services
71322200 - Pipeline-design services