2nd phase of the general renovation and extension of the existing city bath in Salzgitter Lebenstedt.
Here: VE 501.01 outdoor facilities, GaLa-Bau
Soil and stones up to Z1.1 to recycle 100 tons
Height adjustment manhole covers, up to 25 cm 14 pieces
Cable trench 30 meters
Collect and dispose concrete block paving 225 m
Pick up concrete block paving and store 50 m
Disconnect and dispose of asphalt haul 75 m
Dissolve the Scotch base layer and store 450 m
Loosen and install floor 50 m
Loosen soil and store 925 m
Surface for traffic area 825 m
Planum for vegetation area 2 300 m
Excavation for pipe trenches and shafts 80 m
Drainage channel 35 m
PP pipe 130 m
Frost protection layer, up to 30 cm 665 m
Schott yield layer, approx. 25 cm 665 m
Pavement, various formats 665 m
Ground loosening, up to 35 cm 2 600 m
Fertilization vegetation area 2 600 m
Infiltration wells 150 m
Hedge plants 210 pieces
Other plants 25 pieces
Provide bark mulch and apply 25 m