The advertised services essentially include:
- the construction of a bypass north of the existing bridge,
- demolition of Wolbeckerstraße bridge no. 76 including abutment,
- the new construction of the Wolbeckerstraße bridge no. 76 including abutment,
- the construction of bank walls in the bridge area,
- the adaptation of the roads (ramps) in front of and behind the bridge.
For the waterbed:
about 1 200 m
deliver about 230 t of sheet piles
about 1 200 m
Make approx. 280 m sheet pile belt
Make about 220 m of sheet piling spar
Produce approx. 80 round bar anchors
Remove approx. 60 round bar anchors
about 650 m
Cut about 180 m of sheet piling with a separating cut
about 170 m
Install approx. 7 pc. ladders
Produce approx. 80 m of steel railing
Remove approx. 55 m of steel railing
about 220 m
about 2 100 m
For the bridge:
1 pc. Steel superstructure (approx. 150 tons) with prestressed concrete slab (approx. 650 tons) floating out and breaking off
Break off 2 abutments made of reinforced concrete
Produce and assemble approx. 530 t steel superstructure
about 5 000 m
about 2 950 m
about 450 m
about 400 m
280 m various metal railings produce
make about 520 m wooden railing
about 1 320 m
Install approx. 170 t of reinforcing steel for abutment
make about 62 lfm well foundation
about 150 m
Install approx. 18 t of reinforcing steel for the plant trough and retaining wall
Make approx. 50 m supporting wall from prefabricated parts
about 560 m
Make approx. 100 m of girder for carrier screed and remove
Produce approx. 30 round bar anchors for carrier screed wall and remove
about 9 500 m
about 1 670 m
about 1 390 m
Make approx. 570 m high ridge for bypass and resume
Make approx. 540 m low buffers for bypass and resume
Approx. 300 m plastic pipeline DN 200 including manholes for drainage of the bypass and dismantling
Approx. 120 m plastic pipeline DN 150 incl. inlets for drainage of the bypass and dismantling
about 12,880 m
about 14 220 m
about 4 450 m
Perform approx. 2 430 m of exploratory drilling for weapon test
about 5 560 m
about 8 350 m
about 3 800 m
about 450 m
about 4 200 m
Take up about 910 m high ridge
Take up about 640 m of low-floor
about 2 650 m
about 3 700 m
about 3 300 m
make about 1 060 m high board
Produce approx. 780 m low floor
Approx. 340 m of concrete pipeline (DN 300) including manholes
approx. 250 m plastic pipe (DN 150 and DN 200) incl