Single market broken down into technical sections:
- section 1: Heating - ventilation - air conditioning - smoke extraction (CVCD),
- section 2: Fire protection plumbing (PPI),
- section 3: Strong currents (CFO),
- section 4: Low currents (CFA),
- section 5: Fire detection (DI),
- section 6: Lifting devices (APE),
- section 7: Automatic doors and barriers (PAU),
- section 8: Green spaces (ESV),
- section 9: Enclosed and covered (CC),
- section 10: Second work (SOE).
Contract with an initial period and three possible renewals.
Multi-technical operation and maintenance of the Villeurbanne police station (69).