Workshops for disabled people (Phase 2) in Limpach_HVAC work for animal guarding.
Workshops for disabled people (Phase 2) in Limpach_HVAC work for an animal caretaker:
- 1 condensing boiler of 25 kW,
- 18 floor heating circuits,
- 36 radiators
- 4 double-flow ventilation units of 700 m
- 24 sanitary appliances,
- 18 electric water heaters,
- hydraulic and aeraulic networks.