Lifting and handling equipment | Tenderlake

Lifting and handling equipment

Contract Value:
EUR 2M - 2M
Notice Type:
Contract Notice
Published Date:
23 July 2021
Closing Date:
13 August 2021
Location(s):
DK031 Fyn (DK Denmark/DANMARK)
Description:
BB2 M3 — Wood Chip Conveyors

Fjernvarme Fyn Production A/S is located in Odense, Denmark and has initiated a project to use wood chips to produce district heating at Fjernvarme Fyn Power Station.

The complete tender documents are ready for download at our homepage: https://fjernvarmefyn.dk/udbud/ using the password ‘BB2M3’ to open the zip file.

The Scope of Supply (Hereafter the Supply) shall comprise a complete functional transport system for feeding of the biomass to the boiler silos in the boiler building of a new heat plant at Fjernvarme Fyn’s power station (Odense Denmark). The transport system is divided as below:

The systems are:

1) Wood chip conveyors.

A system for wood chips, that can transport the wood chips from the battery limit at Lot M1 (fuel handling system) to the battery limit at Lot M2 boiler bins.

2) Option: Bio pellet conveyors.

A system for bio pellets to transport the pellets from pellet storage to the battery limit at Lot M2 pellet silo.

3) Option: Wood chip conveyor to open storage.

A conveyor for wood chips to transport the wood chips from existing chain conveyor to existing coal conveyor at the open storage area.

The Supply must be engineered, delivered, installed, cleaned, tested, commissioned and documented in accordance with the limits specified and be ready for commercial operation. When completed, the supply must be fit for the purposes for which the supply is intended as defined in the Tender Material.

Download full details as .pdf
The Buyer:
Fjernvarme Fyn Produktion A/S
CPV Code(s):
42410000 - Lifting and handling equipment