Delivery of 10-20t LH2 to the P8 test bench in several batches.
Delivery of 10-20t LH2 to the P8 test bench in several batches (March 2023 – February 2024).
The demand for Liquid Hydrogen from the Technical Specification is estimated. The DLR does not undertake to purchase a minimum amount.
Delivery of 10-20t LH2 to the P8 test bench in several batches (March 2024 – February 2025).
The demand for Liquid Hydrogen from the Technical Specification is estimated. The DLR does not undertake to purchase a minimum amount.
This Lot is an option and may not be awarded at all!