Contract B construction consists of the following:
Basement
— the construction of a single level basement of circa 8 000 m
— design and installation of secant pile wall;
— the basement will be common to a number of buildings with common services;
— the basement will incorporate foundations for substructure for other buildings within the development.
Parcel 1: One Opera Square
— One Opera Square will be a 6 story over basement modern nZEB office at corner of Michael Street and Ellen Street;
— the building has a gross area of c14 600 m
— the office building shell and core is targeting a sustainability accreditation such as Leed Gold and Well certification.
Limerick Twenty Thirty are seeking to carry out construction works at Contract B of the Opera Site.
The Opera Site is a 3.7 acre site located in Limerick City between Rutland Street, Patrick Street, Ellen Street, Michael Street and Bank Place.
Contract B construction consists of the following:
Basement
— the construction of a single level basement of circa 8 000 m
— design and installation of secant pile wall;
— the basement will be common to a number of buildings with common services;
— the basement will incorporate foundations for substructure for other buildings within the development.
Parcel 1: One Opera Square
— One Opera Square will be a 6 story over basement modern nZEB office at corner of Michael Street and Ellen Street;
— the building has a gross area of c14 600 m
— the office building shell and core is targeting a sustainability accreditation such as Leed Gold and Well certification.